October 15, 2009
China Buys Two 880 MWe Fast Neutron Nuclear Reactors from Russia
Posted by: admin : Category: Technology
Background information on fast neutron reactors.
India should have fast breeder reactor operating in 2011.
A 500 MWe prototype fast breeder reactor (PFBR) is under construction at Kalpakkam and is expected to be operating in 2011, fuelled with uranium-plutonium oxide or carbide. It will have a blanket with thorium and uranium to breed fissile U-233 and plutonium respectively. Initial FBRs will have mixed oxide fuel but these will be followed by metallic fuelled ones to enable shorter doubling time.
FURTHER READING
BN800 status from Aug 20, 2009
BN-800 as a New Stage in the Development of Sodium Cooled Fast Reactors

